Deconstruction of the UF6 Building 27 at the Cameco Conversion Facility
April 23, 2025
The deconstruction and dismantling of Cameco’s UF6 Plant, commonly known as Building 27 (B27), was an abandoned processing facility, heavily contaminated with radiological and chemical material. It consisted of two, two-story building sections and a central seven-story tower section with a total footprint of 72,800 square feet.
Read more.